When sea-lines or electrical cables are to be laid we excavate and transport the resulting materials to authorized discharging points. Checking the compliance between design specifications and work done follows, then pipe is laid. Last step is filling the trench to restore bottom conditions. | ||||||||||||||||||
|
||||||||||||||||||